Plan on six to ten weeks for Orlando. We're 2,179 straight-line miles from Central Florida, so the calendar is set by the freight booking and the crew's flights more than by open press time.
What sets the Orlando clock
- Freight: the gear leaves La Habra well before load-in. A date change needs two weeks' notice so we can rebook it.
- Art and blanks: final art about a week out, and the blank order locks at the same time. A headcount that keeps moving slows an Orlando job down more than anything on our side.
- Show weeks: when Orlando's Orange County Convention Center has a major show on, hotel rooms, drayage and labor tighten across the International Drive corridor at the same time.
Closer than six weeks? Ask anyway. Simple art and standard blanks are what make a short Orlando turnaround possible, and the answer depends on whether the freight can still get there. If you're planning an OCCC booth months out, we'll hold the date now and settle the design later. Either way, tell us your date and headcount and we'll confirm availability within 24 hours.
Resort weekends in Lake Buena Vista and Kissimmee compete with convention business for load-in slots, and the summer storm season adds a tent or an indoor backup to the plan. Both are easier to arrange with the full six to ten weeks.