Book six to ten weeks out for an Orlando event. That window isn't about press time. It's about getting freight from La Habra to Central Florida and the crew onto flights before load-in.
A working Orlando timeline
- Ten weeks out: the right time for a booth at Orlando's Orange County Convention Center or a big resort program in Lake Buena Vista. Show weeks fill hotels and drayage slots early.
- Six to eight weeks out: fine for most receptions, activations and parties. Send the date, venue and headcount and we lock the plan.
- Under six weeks: ask. It depends on whether the freight can still get there, and simple art helps.
- About a week out: art is final and the blank order locks.
What speeds things up
Final artwork, a firm headcount, the venue's load-in rules and the stations you want. Resorts and the convention center both run fixed load-in windows, so the sooner we have them the sooner the freight gets booked.
Date moved? Give us two weeks' notice so we can rebook the freight.
Check booking lead time and pricing, then request your Orlando quote.
Orlando planning
Why Orlando needs the lead time
Summer adds one more item: an outdoor station needs a tent or an indoor fallback for the afternoon storms, and that's easier to arrange with the full window.
Our shop is in La Habra, 2,179 straight-line miles from Orlando. The presses, heat presses, blanks and tables ship as freight, and the crew flies in the day before load-in. A station needs about 10×10 ft and two dedicated 120V/20A circuits.